A redevelopment project will include the addition of a new neighborhood to an ex

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-7-24 14:56:08 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题D[查看]
A redevelopment project will include the addition of a new neighborhood to an existing block of office buildings. What would a project need to do for GIB Credit Infrastructure Energy Efficiency?

A: Replace all existing traffic and street lights with new more energy efficient ones
B: Install new infrastructure that has the lowest first costs
C: Install all new infrastructure
D: Install a district heating and cooling system that provides at least 80% of the project\'s annual heating and/or cooling cons

参考答案: C

本题解释:
A:Projects do not have to replace existing infrastructure.
B:The lowest first cost components will often be least efficient and wouldn\'t get the project to the 15% savings.
C:Install all new infrastructure that will help achieve a 15% annual energy reduction below an estimated baseline energy use.
D:This is for GIB Credit 12, don\'t confuse the requirements of the two.


Notes:

Reference: GIB C13, Requirements
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 20:46 , Processed in 0.076436 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部