A project will be located on an infill site. What must occur when developing por

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-6 05:49:38 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题A[查看]
A project will be located on an infill site. What must occur when developing portions of the site that lie within a 100-year moderate-risk floodplain as defined by FEMA?

A: Build structures only within nonconveyance areas
B: Nothing, only high-risk floodplains require special actions
C: Comply with the National Flood Insurance Program (NFIP) requirements for developing the portions of the site within the flood
D: Install a man made wetland to capture additional water

参考答案: C

本题解释:
NFIP requirements must be followed when developing in floodplain areas in infill or previously developed sites.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 04:10 , Processed in 0.074636 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部