- 注册时间
- 2012-6-16
- 最后登录
- 2023-9-11
- 阅读权限
- 150
- 积分
- 512
- 精华
- 0
- 帖子
- 213
 
|
试卷: LEED AP EB模拟题 A卷[查看] When conducting a survey as part of the calculations for SS Credit 4 Alternative
Commuting Transportation, which dates/times are the best? A: A survey conducted each Monday throughout a month. B: A survey conducted on Monday at the start of a workweek C: A survey conducted each day starting on Monday and ending on Friday D: A survey conducted during the summer 参考答案: C
本题解释: Notes:
See Reference Guide, SS Credit 4, Calculations, Option 3, Survey Timing
The survey needs to occur on five consecutive workdays, or on the Friday at the end o f
a workweek. For circumstances where the building has normal work hours on
weekends, the survey can start/end on those days.
Weeks with holidays must be excluded.
Extreme weather periods should be avoided. Note the question asks what the best
times are. While the summer is accept able, it isn\'t the best choice. USGBC
encourages surveys in spring or fall so t hat weather is not as much a factor. |
|