The water utilities for an entire campus are served by a central plant. Which st

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-9-21 18:27:08 |只看该作者 |倒序浏览
试卷: LEED AP EB模拟题 C卷[查看]
The water utilities for an entire campus are served by a central plant. Which statement is
true regarding the project\'s ability to earn WE Credit 1 Water Performance Measurement?
A: Whole building and submetering must be done
B: The project must install a meter on the central plant
C: The project cannot earn the credit
D: Whole building metering must be done

参考答案: D

本题解释:
Notes:
See Reference Guide, WE Credit 1, Requirements

The credit can be earned by installing whole building metering. Submetering is required i f
the project is attempting 2 points.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 00:45 , Processed in 0.073229 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部