A project is located in an area with a demand-response program and that has enou

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2014-6-5 12:28:10 |只看该作者 |倒序浏览
试卷: LEED v4 GA模拟题A卷[查看]
A project is located in an area with a demand-response program and that has enough room for a wind-turbine to allow for on-site renewable energy. If the project implements both of these strategies, which of the following will occur?
A: The project’s energy demands will decrease
B: The project’s renewable energy production will decrease
C: The project’s minimum energy performance will decrease
D: The project’s energy costs will decrease

参考答案: D

本题解释:
D:Demand-response programs usually include financial incentives during demand response events. The utility company asks the building to use less electricity, the building agrees, and the building owner is rewarded with a price break. In turn, the utility company saves money by spending less money on additional transmission lines and power plants.

A: The energy demands remain constant for this project. The wind turbine will offset the need for grid-supplied energy. The demand response participation will curb the building’s energy use during peak times.

B:The renewable energy production doesn’t decrease if the project is also in a demand-response program.

C:The minimum energy performance for the project would remain the same. On-site renewables do not count toward reducing the minimum energy required to run the building.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-21 19:35 , Processed in 0.081412 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部