LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 266|回复: 0
打印 上一主题 下一主题

A project that reduces the amount of wastewater transported off site helps achie

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-2-1 23:03:43 |只看该作者 |倒序浏览
试卷: LEED v4 GA模拟题C卷[查看]
A project that reduces the amount of wastewater transported off site helps achieve which of the following?(Choose 2)
A: A reduction in the demand for potable water
B: A reduction in the need for graywater used on site
C: A reduction in energy required to treat wastewater
D: A reduction in the demand for wastewater treatment infrastructure

参考答案: CD

本题解释:
正确答案:CD
系统解析: Notes:

For this question, think about the water leaving the site. What is the result?

1) Reduced energy to treat that wastewater
2) Reduced demand for wastewater treatment infrastructure.

Both of these reduce GHG and other pollutants created by water transportation and treatment facilities, which in turn improves quality of life for humans and lessens environmental burdens.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-13 22:50 , Processed in 0.075883 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部