试卷: LEED v4 GA模拟题A卷中文[查看] 施工活动污染防治与下列哪些其他项目方面有协同关系?(选2项)Construction activity pollution prevention has synergies with which of the following other project areas?(Choose 2) A: 雨水管理 Rainwater management B: 保护或修复栖息地 Protecting or restoring habitat C: 室外用水 Outdoor water use D: 热岛效应减弱 Heat island reduction 参考答案: AB
本题解释: 正确答案:AB
系统解析: 实施正确的情况下,施工活动污染防治能够减少场地土壤压实和侵蚀。从而避免了原有土壤的干扰,雨水的自然渗透能力得到提高,土地得到保护(保护场址绿色用地greenfields不受干扰)
Notes:
When properly implemented, construction activity pollution prevention can reduce the compacting of the site\'s soil due to grading, construction vehicle traffic, and erosion. By avoiding disturbing the soil, natural infiltration from rainwater can be improved and land can be protected (preserving greenfields).
|
|