- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 OM模拟题A卷英文[查看] A school project has both naturally and mechanically ventilated spaces. To provide enhanced IAQ for the students what strategy can the project team select that would earn the project credit?
学校项目有自然和机械通风空间。为给学生提供增强的室内空气质量,项目团队可以选择哪些策略来获得项目得分? A: 安装室外空气测量装置,以便在空间以自然通风模式运行时使用 B: 在所有人口密集的空间,通风量增加30% C: 在自然通风的空间安装过滤装置 D: 在机械通风空间内安装了开启提醒 参考答案: A
本题解释: 选择A,本题解释 A.Projects with mix-mode ventilation systems only need to pick one total strategy. B.This is not an option for the credit. C.Filtration is not an option for naturally ventilated spaces. D.Alarmed openings are not an option for mechanically ventilated spaces. |
|