A project team is working on three retail spaces located on different sites in t

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-23 09:58:07 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
A project team is working on three retail spaces located on different sites in the same area. Which statements are true regarding the construction waste management plan(s) required for the projects?(Choose 2)
A: The plan(s) must identify at least five types of materials to divert from landfills
B: The same plan can be used for all three projects.
C: The plan(s) must include an overall project waste diversion goal
D: The plan(s) can include hazardous material removal in the project\'s total waste diversion

参考答案: AC

本题解释:
Notes A: A CWM plan must list at least five waste streams to divert. B:The plan must be customized for each project. C: A CWM plan must include a diversion goal. D: A hazardous material removal and disposal plan is required in a CWM plan; however, this doesn\'t count toward the total waste diverted or as a separate waste stream (1 of 5 required).
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-24 09:04 , Processed in 0.073951 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部