A project team is reviewing a new insulation material that is Cradle to Cradle v3 Gold certified. If they use this product on the project what credits would it contribute to?
A: MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2 Leadership Extraction Practices
B: MR Credit Building Product Disclosure and Optimization - Material Ingredients, Option 1 Material Ingredient Reporting and MR
C: MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2 Leadership Extraction Practices
D: MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1 Raw Material Source and Extracti

参考答案: B

本题解释:
Notes:B:Cradle to Cradle products (depending on the level) can be applied to both the disclosure and optimization options of MR Credit Building Product Disclosure and Optimization - Material Ingredients.
For Option 1 the product must has been certified at the Cradle to Cradle v2 Basic level or Cradle to Cradle v3 Bronze level.
For Option 2 the following are accepted:
Cradle to Cradle v2 Gold
Cradle to Cradle v2 Platinum
Cradle to Cradle v3 Silver
Cradle to Cradle v3 Gold or Platinum
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 20:31 , Processed in 0.080264 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部