- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题B卷英文[查看] What is the benefit of preparing a concept model for compliance with IP Credit Integrative Process? A: It can be used to verify the prescriptive requirements are met for EA Prerequisite Minimum Energy Performance B: It can form the basis of the preliminary energy model for a tenant-lelve energy simulation C: It can be used as the baseline model for a proposed design D: It can earn a project extra points when following the prescriptive compliance path of EA Credit Optimize Energy Performance 参考答案: B
本题解释: 选择B,本题解释 When doing a tenant-level energy simulation for EA Prerequisite Option 1, teams must engage a qualified energy modeler to create a preliminary model to aid in design decisions. This model will help as long as there is time to alter the design.
The concept model prepared the project team to create the simple box energy analysis that is part of the Integrative Credit and that can be used as the basis of the preliminary model. The preliminary model analyzes building design configurations and heating and cooling load reduction strategies and is used for Option 1. |
|