试卷: LEED v4 ID+C模拟题C卷英文[查看]
What design decisions will help a project earn points under the prescriptive path of EA Credit Optimize Energy Performance?(Choose 2)
A: For the tenant fit-out of spaces, provide a separate control zone for each solar exposure and 50% of interior spaces.
B: Comply with the recommendations in the appropriate ASHRAE 50% Advanced Energy Design Guide for all vertical fenestration.
C: Install occupancy sensors for at least 75% of the connected lighting load
D: Install ENERGY STAR appliances, office equipment, electronics, and commercial food service equipment (HVAC, lighting, and bui

参考答案: BC

本题解释:
Notes:A:All interior spaces, not 50%.B:2 Points for Building Envelope, Glazing.C:1 Point for Interior Lighting Controls.D:This just meets the prerequisite requirements.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 20:13 , Processed in 0.077130 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部