LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 205|回复: 0
打印 上一主题 下一主题

Under what circumstances are projects exempt from WE Prerequisite Indoor Water U

[复制链接]

1759

主题

1

好友

5684

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-7 22:40:40 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
Under what circumstances are projects exempt from WE Prerequisite Indoor Water Use Reduction?
A: When the project has only one gender (male or female)
B: When WaterSense labeling is not available
C: When fixtures or fittings are not within the tenant spaces
D: When the days of operation per year is less than 365

参考答案: C

本题解释:
选择C,本题解释If you have a tenant space on the floor of a building where the restrooms may be out in the hallway, the prerequisite doesn’t apply.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-22 15:35 , Processed in 0.075899 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部