试卷: LEED v4 ID+C模拟题D卷英文[查看]
Which response is a possible consequence if a project does not comply with the minimum program requirements?
A: An alternative compliance path may be used
B: The project team may need to submit a CIR
C: If the project has earned a LEED certification, the building\'s certification may be revoked
D: Additional fees or fines may be incurred

参考答案: C

本题解释:
选择C,本题解释A project must adhere to the LEED Minimum Program Requirements (MPRs) in order to achieve/retain LEED certification. Failure to comply with MPRs may result in the certification being revoked. No fees will be refunded.

A project can meet the MPRs prior to certification, then earn project certification, and then later something may change so that the project no longer meets the MPRs. An example of this scenario is if the occupancy rate of the building decreases.

Note that after the project is certified (has attained any LEED certification at any level), the project must continue to meet the MPRs or certification can be revoked. For example, if a hotel is certified, and then the hotel shuts down, the hotel is not maintaining the minimum occupancy levels required by the MPRs. The certification could be revoked.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-22 07:33 , Processed in 0.075544 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部