A new office project has come up one point short of LEED Platinum as the project is approaching completion. The project team is reviewing EQ Credit Acoustic Performance to see if it can be achieved. How can the project team check if the HVAC background noise meets the requirements?
A: Specify finish materials to meet the 2010 FGI Guidelines
B: Measure the sound pressure levels
C: Calculate the reverberation times
D: Verify the composite sound transmission class (STC) requirements

参考答案: B

本题解释:
选择B,本题解释 A.This is done for LEED BD+C: Healthcar Option 2 Acoustical Finishes
B.Calculations or measurements can be used to verify HVAC background noise levels. C.This is done for checking the reverberation time requirements are met. D.This is done for sound transmission.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-6-22 00:25 , Processed in 0.077889 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部