LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 300|回复: 0
打印 上一主题 下一主题

A project team reviews a project design and finds that the design does not compl

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题C卷英文[查看]
A project team reviews a project design and finds that the design does not comply with SR Credit Heat Island Reduction using the standard non-roof/roof calculation due to the project having multiple roof angles and materials that fall above and below the minimum SRI and SR values. Which action should the project team take next?
项目团队正在审核项目的设计文件,由于项目有多种类型角度的屋顶,屋顶使用了多种材料,既有高于最低SRI和SR值的,也有低于相应最低值的,按SS 得分项热岛效应降低中屋顶或非屋顶的部分进行计算,发现无法满足要求。项目团队下一步应该怎么做?
A: Incorporate additional mitigation strategies 融入其缓解措施
B: Locate at least 30% of the parking spaces under cover 将30%的停车位设置在地下
C: Use the weighted non-roof/roof calculation to see if the design will comply 按权重使用屋顶/非屋顶部分进行计算来查看设计是否符合要求
D: Submit a CIR for clarification on the how the roof angles can be calculated 递交CIR来解释澄清屋顶角度是如何被考虑在计算内的

参考答案: C

本题解释:
选择C,本题解释A.If after the project team finds that equation 1 and equation 2 don\'t yield the desired results, the design needs to be addressed. B.Parking under cover is for Option 4. This question is asking about Option 2. Additionally the minimum for undercover parking is 50%. C.The next step is using the second equation. D.This is not correct.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 08:59 , Processed in 0.081466 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部